MATADERO________________________________________________FIRST APPROACHMENT
DEMANDS:
-To design in a draft level.
-For the correct evaluation of the project, it has to be clear the use of PLADUR systems.
-All construction details needed for the understanding of the project.
-Technical specifications, report and a budget.
EVALUATION CRITERION:
-Correct use of PLADUR systems. Which is the quantity of used systems?
-Innovative way.
-Programme:
5 private spaces (50m2 each)
common social space (50m2)
-Fulfill ALL REGULATIONS
-Different users
Design flexibility
-Economic viability.
-We can just modify the floors.
-PLADUR:
partitions
ceilings
trasdosado
the rest can be done with other construction materials
- EXTRA: ECO-DESIGN and INNOVATION (energy efficiency)
FAQs:
Is it a permanent intervention? What grade of flexibility?
Do we have to maintain vertical communication?
How many modules?
FIRST APPROACHMENT TO THE EXISTING BUILDING:
The building is composed by two defined parts.
-A. The principal entrance and vertical communication core.
-B. The main pavillion.
They share only one structure line, the one that is centrated in the longer axis. The rest of the structure is independent from A to B.
It has been noticed that part B is symetrc in its both axises.
Also, the highest floor, is completly opened in terms of façade.
STRATEGY:
The first strategy of operation is to locate installations (165m2 approx.) and consumer area in the communication body. Our aim is to distinguish the creative and the exposition zones.
Secondly, to increase the amount of light inside the building. Therefore, the team has decided to remove all B pavillion's floors. Also, a relation with the original façade has been treated as a continuous void. And we want to use the existing axes to structure the living/working spaces.